Campus TRIANGL Uherske Hradiste - construction technology project
Chamrádová, Klára ; Kopecký, Lukáš (referee) ; Biely, Boris (advisor)
The subject of this thesis is a construction technology project Areal triangle in the town of. The work includes a technical report on the structural and technological project technical report construction site along with drawings of building equipment, technological prescription for the implementation process of monolithic structures, being associated inspection and test plan, as well as draft mechanical assemblies, technical report broader transport relations, including drawings, itemized budget calculation according THU and the timetable for construction. It also dealt with contract work, instructions for use of the building and assess two variants of cranes in economic terms. Also at work are chapters dealing with safety at work and environmental protection. More specifically, the work deals with one of the main buildings, namely the object SO10 - Building A. The construction is a reinforced concrete monolith on five floors. The work is mainly focused on the shell construction.
Central hospital buildings in Uherske Hradiste - Building construction technology preparation
Novotný, Zdeněk ; Hanzelková, Martina (referee) ; Šlanhof, Jiří (advisor)
This diploma thesis deals with construction and technological preparation of the construction of the central hospital building in the town Uherske Hradiste. The work is composed of selected parts of the building and technological project, which is annexed to the diploma thesis. On some selected parts of the building and technological project is also prepared relevant drawings. The aim of the thesis is to choose a suitable and effective implementation process object depending on the circumstances and determine the resources of time, funds, personnel and materials.
Construction Project for Implementation of Industrial Hall in Hodějice
Koudelková, Anna ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The final thesis is focused on construction of the complex Milmar s.r.o. company, specifically, it focuses on the construction technology project of the SO02 Production Hall building. Diploma thesis detail solved through technological regulations prefabricated reinforced concrete skeleton construction of the hall and then implement concrete floors with infill. For the construction of the hall, an itemized budget was prepared with a statement of area, time schedule, health and safety plan, design of construction supply and assessment of transport routes, the main construction mechanisms were selected and variants of the main construction mechanisms, control and test plans were assessed. An accompanying and technical report, a construction technology study, and the sustainability certification of the LEED 2009 system were prepared for the entire construction. The text and drawing part was prepared according to the assignment of the diploma thesis.
Sadova, Apartment building M1 - construction technology project
Štěrba, Marek ; Řihák, Pavel (referee) ; Biely, Boris (advisor)
The aim of the diploma thesis is construction-technological project of the whole construction focusing on the main building object - Apartment building, which is based on large-diameter drilling piles. The basis of the work is the budget of the main building and its timetable. Part of the thesis is a solution of organization of construction and design of building site equipment, technological regulation of selected activities, quality control and solution of transport relations including oversized transport. In addition, the design of the machine assembly, assessment of lifting mechanisms, safety and health protection and protection of the environment are solved.
Multipurpose Hospital Building in Český Krumlov - Building Technology Project
Mikulášek, Jiří ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
The diploma thesis is focused on the elaboration of a construction technology project for the construction of a new hospital pavilion in Český Krumlov. The thesis processes the preparation of construction and proposal of the organization of individual activities on the construction site in time sequence. The thesis contains technological regulations for the foundation of construction and realization of the monolithic frame on the 1st floor, which also includes drawings of the formwork of the ceiling slab and a scheme of formwork of columns and walls. Further contents are technological report, technological study of realization, transport relations, time and financial plans, complete construction site equipment for the whole construction phase, design of construction mechanisms and assessment of their suitability for use, resource balance, technological analysis, itemized budget, and occupational health protection for selected processes and noise studies dealing with the impact of building construction on the surrounding development.
Multifunctional house in Brno, Chernivtsi - construction technology project
Kondáš, Ondřej ; Nečasová, Barbora (referee) ; Biely, Boris (advisor)
The aim of this master's thesis is the construction-technological project of the entire building focusing on major construction building - Multifunctional house, which is based on large-diameter piles. The main part of thesis are budget of object and time schedules of construction. Part of the thesis is organization of construction and design of the site eguipment, technological regulation of selected work, quality control and solving transport relations including oversize cargo. It also deals with the design of mechanical assemblies, health and safety, safety of environment and design of instructions for use of building.
Construction Project for Implementation of Industrial Hall in Hodějice
Koudelková, Anna ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The final thesis is focused on construction of the complex Milmar s.r.o. company, specifically, it focuses on the construction technology project of the SO02 Production Hall building. Diploma thesis detail solved through technological regulations prefabricated reinforced concrete skeleton construction of the hall and then implement concrete floors with infill. For the construction of the hall, an itemized budget was prepared with a statement of area, time schedule, health and safety plan, design of construction supply and assessment of transport routes, the main construction mechanisms were selected and variants of the main construction mechanisms, control and test plans were assessed. An accompanying and technical report, a construction technology study, and the sustainability certification of the LEED 2009 system were prepared for the entire construction. The text and drawing part was prepared according to the assignment of the diploma thesis.
Multipurpose Hospital Building in Český Krumlov - Building Technology Project
Mikulášek, Jiří ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
The diploma thesis is focused on the elaboration of a construction technology project for the construction of a new hospital pavilion in Český Krumlov. The thesis processes the preparation of construction and proposal of the organization of individual activities on the construction site in time sequence. The thesis contains technological regulations for the foundation of construction and realization of the monolithic frame on the 1st floor, which also includes drawings of the formwork of the ceiling slab and a scheme of formwork of columns and walls. Further contents are technological report, technological study of realization, transport relations, time and financial plans, complete construction site equipment for the whole construction phase, design of construction mechanisms and assessment of their suitability for use, resource balance, technological analysis, itemized budget, and occupational health protection for selected processes and noise studies dealing with the impact of building construction on the surrounding development.
Sadova, Apartment building M1 - construction technology project
Štěrba, Marek ; Řihák, Pavel (referee) ; Biely, Boris (advisor)
The aim of the diploma thesis is construction-technological project of the whole construction focusing on the main building object - Apartment building, which is based on large-diameter drilling piles. The basis of the work is the budget of the main building and its timetable. Part of the thesis is a solution of organization of construction and design of building site equipment, technological regulation of selected activities, quality control and solution of transport relations including oversized transport. In addition, the design of the machine assembly, assessment of lifting mechanisms, safety and health protection and protection of the environment are solved.
Multifunctional house in Brno, Chernivtsi - construction technology project
Kondáš, Ondřej ; Nečasová, Barbora (referee) ; Biely, Boris (advisor)
The aim of this master's thesis is the construction-technological project of the entire building focusing on major construction building - Multifunctional house, which is based on large-diameter piles. The main part of thesis are budget of object and time schedules of construction. Part of the thesis is organization of construction and design of the site eguipment, technological regulation of selected work, quality control and solving transport relations including oversize cargo. It also deals with the design of mechanical assemblies, health and safety, safety of environment and design of instructions for use of building.